Engineer's Pool Board Guarantee
YOUR CLAIM:
- Engineer’s pool board guarantee (FR)
REQUIRED DOCUMENTATION:
- Assignment
- Location
- Work history
REQUIRED CLAIM LANGUAGE:
During the (U* or 2"^“ HALF OF MONTH), I was assigned to the (LOCATION and BOARD LIST) guaranteed engineer’s pool freight board. I was available and I did not absent myself from the pool board, and I did not take extra rest for any reason during the pay period. I worked assignment (ASSIGNMENT) on (DATE) and observed a mandatory (48 or 82)-hour rest period on (DATES). The Carrier unilaterally placed me in “FR” status and arbitrarily removed me from my assignment during the rest period.