Hostling Power by Road Crew
                                				
                                			 
                                		 
                                	 
                                    								 
							 
						
						    						    
						        
                                
                                	
                                        
                                        	
                                        	
                                        		
                                        			  			Road Crew Hostling Power (PLB #5912, Case#125, Award 125) (SBA 18, Award 5978)  The Claim:    -   
When called off the road and are instructed to hostle power not in connection with your train within switching limits and appropriate hostlers/yardmen were available.     -   
The penalty is for a 130 mile basic day as per PLB #5912, Case#125, Award 125        REQUIRED DOCUMENTATION:    -   
A copy of your federal tie-up.     -   
Any track inquiry, train list, power report, or BU that you can print and show the power on your train     -   
Train equipment trace (my up-train-equipment trace-locmotive id) showing the unit(s) improperly handled.     -   
A printed snap shot of the switchman/hostler extra board, showing available switchmen/hostler.     -   
List unit number(s), yard, tracks, and times:       -   
For cutting away, changing directions, etc.     -   
For moves entering, shoving, coming against other power/trains     -   
For coming back against your train.     -   
You can’t have too much documentation on these claims.     -   
Keep track of who instructed you to perform the service (yardmaster’s or manager’s title and name)            REQUIRED CLAIM LANGUAGE:  Was called off the   (circ 7 and board)  on   (date)   @ ____ hrs for the    (road job/symbol) . At ____ hrs was instructed per  (yardmaster/manager’s name) to perform the following hostling move with no connection to my assignment:  (include all details: unit number(s), yard, track#, times, route taken, etc)   Claim basic day for hostling power not in connection with train as per PLB#5912, Case#125, Award 125, and SBA 18, Award 5978.   NOTE:  Make certain to pass all pertinent info along to the person(s) that should have properly been called to perform the work, as they also should file a mishandling claim.	 		                                        		 
                                        	 
                                        	 
                                         
    		                            
                                	 
                                 
    
    						    
    						    
    						    
                                
						    						
					 
				 
			 
			
						
							
			
			 
		 
		 
	 
	
    
	
	    
	
            
		 
	
 |