Hostling Power by Road Crew
Road Crew Hostling Power (PLB #5912, Case#125, Award 125) (SBA 18, Award 5978) The Claim: -
When called off the road and are instructed to hostle power not in connection with your train within switching limits and appropriate hostlers/yardmen were available. -
The penalty is for a 130 mile basic day as per PLB #5912, Case#125, Award 125 REQUIRED DOCUMENTATION: -
A copy of your federal tie-up. -
Any track inquiry, train list, power report, or BU that you can print and show the power on your train -
Train equipment trace (my up-train-equipment trace-locmotive id) showing the unit(s) improperly handled. -
A printed snap shot of the switchman/hostler extra board, showing available switchmen/hostler. -
List unit number(s), yard, tracks, and times: -
For cutting away, changing directions, etc. -
For moves entering, shoving, coming against other power/trains -
For coming back against your train. -
You can’t have too much documentation on these claims. -
Keep track of who instructed you to perform the service (yardmaster’s or manager’s title and name) REQUIRED CLAIM LANGUAGE: Was called off the (circ 7 and board) on (date) @ ____ hrs for the (road job/symbol) . At ____ hrs was instructed per (yardmaster/manager’s name) to perform the following hostling move with no connection to my assignment: (include all details: unit number(s), yard, track#, times, route taken, etc) Claim basic day for hostling power not in connection with train as per PLB#5912, Case#125, Award 125, and SBA 18, Award 5978. NOTE: Make certain to pass all pertinent info along to the person(s) that should have properly been called to perform the work, as they also should file a mishandling claim.
|